Cat B fit-out · Live building · 2025
Stockport service centre
A large public-facing service centre, fitted out while it was open and staffed. Not an empty shell handed over on a Friday — a working floor with the public coming through the doors and staff at their desks throughout.
That changes everything about how you build. The floor was delivered in phases so service positions came back online in batches — powered, cabled and screened before anyone sat down. Noisy trades ran out of hours. The separation between the works and the public had to hold every single day.
The client is confidential. But this is the job to look at if you're asking whether we can build around your operation instead of shutting it down.
Project facts
- Contract Cat B fit-out
- Value circa £175,000
- Status Complete
What we did
Scope of works.
- Phased fit-out of a live, staffed floor
- 90+ numbered service positions
- Desking, screens and acoustic dividers
- Public waiting areas and wayfinding
- Power, data and floor-box cable management
- Suspended ceilings and lighting
- Full mechanical and electrical
- Out-of-hours working and public separation
The challenge
What made it hard.
The building never closed. Staff worked at their desks and the public came through the doors every day of the programme. Positions had to come back online in batches, and the separation between the works and the public had to hold without fail.
The outcome
How it finished.
Delivered in phases with no closure of the service. On programme, settled at the agreed final account.